Give Us A Call Today!
(970) 249-2251
2018

Colorado Outdoors Development

The Montrose Urban Renewal Authority (MURA) was formed in 2016 to revitalize a 165 acre “blighted area” as defined in the Colorado Urban Renewal Law, Part 1 of Article 25 of Title 31 of the Colorado Revised Statutes in the Northwest of the City of Montrose. 
Read more
2006

Oxbow Crossing & 
River Landing

Montrose’s premier shopping districts, River Landing and Oxbow Crossing, located in South Montrose on Highway 550 includes local businesses, restaurants, and retail chains Target, JCPenny, Ross, Marshalls, Natural Grocers, Petco, and Joann. Along with the topographic, boundary, and aerial surveying of the site, maps for annexation and zoning and subdivision plats were created.
Read more
2019

Connect Initiative Recreational Trail Design

This project entailed the design of approximately 2.25 miles of 10’ wide hard-surfaced recreation trails in two reaches. The northern reach commenced at the City’s existing West Main trailhead and continued north along the Uncompahgre River with an underpass crossing beneath the West Main bridge (Hwy 90) to connect to the Montrose Urban Renewal Authority (MURA) project. 
Read more
2018

Columbine Middle School

For the new 75,000 sq ft middle school, Del-Mont provided surveying, civil engineering, utilities design, drainage design and calculations, site planning, and construction staking. Additionally, a Land Exchange Plat was done for the school district and City.
Read more
2017

Montrose County Road & Bridge Facility Project

The 14 acre Montrose County Road & Bridge Facility Project includes an administration/fleet building, road & bridge crew building, two wash bays, two fueling stations, snow plow/grader building, two equipment sheds, sand shed and loading ramp.
Read more
2017

Olathe High School Drainage Improvement Phase 1

The Olathe High School property has been plagued by drainage issues between the school buildings and the football field. A retaining wall system and storm drainage network was designed to solve the drainage issues and beautify the grounds behind the school, creating an enjoyable space for students, faculty, and visitors.
Read more
2016

Montrose Airport Outdoor Baggage Claim

Topographic survey and civil design for a three (3) bay outdoor baggage claim facility and existing stormwater drainage problem at the north end of the existing terminal building. While collecting topographic survey data, Del-Mont’s surveyors discovered an existing, forgotten underground stormwater pipe under the project site.
Read more
2017

Blue Lake and Lewis Lake Bathymetric Survey

The Blue Lake and Lewis Lake surveys included topographic surveying of the surface, photogrammetry, and bathymetric surveys of Blue Lake and Lewis Lake to collect data to determine total storage volume, useable volume, and dead pool volume of each lake.
Read more
Share by: